Date: December 31, 2023
Location: Fremont, OH
Full Tear-off, Fully Adhered Duro-Fleece Installation, and Tapered Insulation.
Learn More
Date: August 1, 2023
Location: Central, OH
838 Acrylic Coating
Learn More
Date: December 1, 2022
Location: Northwest, OH
838 Silicone Coating
Learn More
Date: December 15, 2021
Location: Toledo, OH
Duro-Sheild Silcone Coating
Learn More
Date: December 15, 2021
Location: Southeast, OH
Tore off existing roof and installed two layers of 2.2 Poly-Iso Insulation (R-25), a Vapor Barrier, and 50-mil Duro-Last to get a 20-Year NDL Warranty
Learn More
Date: December 15, 2021
Location: Southeast, OH
Installed EPS Flute Fill Insulation, two layers of 2.2 inch Poly-Iso Insulation (R-25), a plastic vapor barrier, and 50-mil Duro-Last to get a 20-Year NDL Warranty.
Learn More
Date: December 15, 2021
Location: Cincinnati, OH
Removed ballast river rock, installed 1-Inch Poly-Iso Insulation and 50-mil Duro-Tuff to get a 20-Year NDL Warranty
Learn More
Date: December 15, 2021
Location: Helena, OH
Installed EPS Flute Fill Insulation, two layers of 2.2 inch Poly-Iso Insulation (R-25), a plastic vapor barrier, and 50-mil Duro-Last to get a 20-Year NDL Warranty.
Learn More
Date: December 15, 2021
Location: Southeast, OH
Tore off exsisting roof and replaced some of the metal deck, then installed two layers of 2.2 Poly-Iso Insulation (R-25), a Vapor Barrier, and 50-mil Duro-Last to get a 20-Year NDL Warranty
Learn More